Mendrel Max 2.0: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
(12 intermediate revisions by the same user not shown) | |||
Line 14: | Line 14: | ||
14 May 2014 | 14 May 2014 | ||
Assembled Top Frame. | Assembled Top Frame. | ||
[[File:MendrelMaxBaseTopFrame.png]] | [[File:MendrelMaxBaseTopFrame.png]] | ||
22 May 2014 | |||
Assembled X Axis and finished Top Frame. | |||
[[File:MendelMaxBaseXaxis.png]] | |||
20 Jun 2014 | |||
Assembled blets for Y and X Axis, screws for Z, wired in electronics and test motion and end stops. | |||
[[File:MendrelMaxAss01.png]] | |||
[[File:MendrelMaxAss02.png]] | |||
1 Sep 2014 | |||
First Excrement (print) was done. Hurray!! The heated bed needs to be installed and system calibrated. | |||
[[File:MendrelMaxFirstPrint01.png]] | |||
Trent W. forged the head bracket. | |||
[[File:MandelMaxHeadBracket01.png]] |
Latest revision as of 02:52, 3 September 2014
Return to Projects Projects
8 May 14
Parts came in
Status as of 14 May 14
Parts are in, started assembly.
14 May 2014
Assembled Top Frame.
22 May 2014
Assembled X Axis and finished Top Frame.
20 Jun 2014
Assembled blets for Y and X Axis, screws for Z, wired in electronics and test motion and end stops.
1 Sep 2014
First Excrement (print) was done. Hurray!! The heated bed needs to be installed and system calibrated.
Trent W. forged the head bracket.