Category:3D Printing

From MAGLab
Revision as of 07:54, 13 March 2023 by Blu (talk | contribs) (→‎Procedures)
Jump to navigation Jump to search

At MAG Laboratory, we maintain a collection of 3d printers assigned to different capabilities and materials. This page serves as an overview for our history, procedures, and equipment.

Equipment

The Zortrax M200 is set aside as a "known good" printer, and it is placed at a high operating priority. Every printer other than the Zortrax is capable of PLA. With that said, some of its capabilities are considered "legacy," and large parts are not recommended since they have a high probability of failure. Many ad-hoc modifications have been implemented during prints on the Zortrax for warp-related failure prevention.

The Creality CR10S is placed at a lower priority. The Zortrax is kept as close to "always printing" as possible, and MAG Laboratory tries to keep either the Creality or the IIIP printing.

The IIIP is slated for trade once the Yangbot's proposed Prusa XL donation arrives. The Yangbot will receive the IIIP, and MAG Laboratory will receive a Prusa XL.

The Pulse XE is a newer arrival at MAG Laboratory. It is currently being commissioned for use at the space, and will soon be available for use at the space.

Members

The current lead of 3D printing activities defaults to the Chief Technical Officer since the suggested 3D printing position is not filled.

Procedures

The following are some of the recommended procedures that MAG Laboratory follows in order to ensure "good" 3d printing quality.

Filament Dehydration

MAG Laboratory has made it a priority to keep filament dry, so dry boxes are used for most printing operations. Symptoms of filament hydration include but are not limited to: filament running while the printer is idle, filament stringing, filament bubbling, print porosity, print bubbling, and print failure. PLA filament that is not dehydrated has a tendency to be very brittle and may break during printing or in storage. Filament that is not confirmed to a dry box will often be placed on a 24hr+ filament dehydration cycle. PLA dehydration is often run longer since dehydration can not be performed at a higher temperature.

Dehydration Instructions

Place filament dehydrator in cardboard box to assist in temperature maintenance and insulation. Place filament in dehydrator.

Set dehydrator to filament temperature. Turn on dehydrator.

Run dehydrator for at least the specified filament dehydration time.

Filament Temperature Time
PLA 35-40C 24h+
ABS 60-65C 6h
(untested) PETG 50-55C 12h

Printer Qualification

The usual low-reliability qualification print is low poly cat. Printers must complete the cat print at an acceptable quality to meet the minimum reliability level of testing.

As of 2022-09-03, a "bed adhesion testing" print of four solid-infill bicycle handlebar shims has been proposed.

When bed leveling fine-tuning is desired, a bed leveling print is performed.

As of 2023-03-10, an axis test has been proposed. This involves printing the YACS and measuring its axes for printer axis misalignment.

Preventive Printer Maintenance

Ad-hoc preventive maintenance is performed on machines with sliding axes. Strategically placed globs of grease are dripped onto the linear axes while the printer is in operation. At times, a "grease on - grease off" approach is taken to remove contaminated grease.

Printer-out Maintenance

At times, printers will fail. MAG Laboratory takes a first-qualified-person approach to unscheduled 3d printer maintenance. When a printer-out event occurs, the stakeholders of the current 3d print queue are notified and printer repairs are undertaken. At times, printers will be placed on extended-offline for failure to meet qualification.

History

MAG Laboratory had a first-generation RepRap MendelMax 1.0 3d printer.

MAG Laboratory eventually received more 3d printer donations since members had printers that they did not use at home.

In November 2019, MAG Laboratory received a server rack that it converted into shelving for its 3d printers.

In June 2021, MAG Laboratory moved its printers to the table at the rear of the electronics room. Additionally, the mendelmax was returned to Trent.

Pages in category "3D Printing"

The following 5 pages are in this category, out of 5 total.